Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 26, 2007     Flap motor installation; Floorboard trimming - (.6 hour)       Category: Fuselage
I finished the installation of the flap motor wire tubing. In order to avoid squishing the tubing between the motor and the bottom of the armrest when the flaps are in the "up" position, I had to rearrange the Adel clamps a bit. Added an Adel clamp under the floor supports to lock the tubing into position. Notched the floorboard where the tubing goes through the floor. The flap wires will be tidied up and connected much later.

Now, the tubing does not touch anything as the motor moves. Cool!


 